Construction and installation works on the third generation project in 3GI site No. 45

(Tengiz Field) (Future Growth Project / Wellhead Pressure Management Project, Mechanical Electrical and Instrumentation (FGP/WPMP, 3GI).

Customer:
Aspan Construction Company LLP (Client: Tengizhchevroil)

Scope of work:
Installation of mechanical electrical equipment and instrumentation at the third generation sour gas injection unit 3GI:

- Preparatory work;
- Electrical work (about 180 km of cable lines laid);
- Installation of main high-voltage overhead power lines;
- Carrying out electrical laboratory tests
- instrumentation;
- Telecommunications;
- Fire safety;
- Laying 24, 48 and 96 optical fiber and coaxial cable (for GPS antennas). The total length is 95 km.
- Routing RJ-45 Category 6 Patch Cords
- Installation of turnstiles and access card readers - 4 sets.
- Installation of GPS Antennas - 3 pcs.;
- Pre-commissioning works

Construction, technical re-equipment, dismantling and maintenance of the facilities of PS Tengiz within the framework of PUMP in the Republic of Kazakhstan.

Customer:
Aspan Contruction Company LLP (Client: CPC-K)

Scope of work:
CPC oil pipeline system. PS "Tengiz". Technical re-equipment of the main pumping station and related facilities:
1.
- Laying of optical cables in a trench, overpass, pipes and their disconnection.
Type: DPD-ng(A)-HF-24U(4x6)11kN. Total length - 5208 m.
2.
- Installation of video surveillance masts - 6 pcs.
- Installation of PTZ cameras - 6 pcs.
- Installation of POE injectors - 8 pcs.
- Video server installation on Trassir OS - 1 pc.
- Installation and configuration of workstations - 2 pcs.
- Camera setup via Trassir software
- Creation and configuration of a graphic plan on the Trassir software (with display of the statuses of sensors and cameras), with the integration of the ACS server database

3.
- Installation of ACS server - 1 pc.
- Installation of an access control system with an automatic locking device, a reader, an exit button, an internal emergency door unlocking device - 3 sets.
- Installation of an access control system with an automatic locking device and an internal emergency door unlocking device - 1 set.
- Mounting of the magnetic contact detector - 17 pcs.
- Installation of the door release device - 1 pc.
- Setting up the ACS system

4.
- Installation of the TREZOR-B04 controller (with a control panel) - 3 pcs.
- Laying the sensitive cable of the TREZOR-B04 system along the fence - 986 m

- Installation of patch cords. Type: optical duplex single-mode SC/LC 9/125 µm, LSZH - 44 pieces, 78 m; optical duplex multimode LC/LC 50/125 µm, LSZH - 4 pcs., 2 m; RJ-45 category 6 - 23 pieces, 25 m
- Installation of optical cross-countries for 24 optical fibers - 16 sets; telephone cross - 1 set.
- Installation of active network equipment:
Cisco ASR 9901-120G - 2 pcs.
Cisco IE-4000-8GT4T-E - 4 pcs.
- Development of a program for commissioning of network equipment (factory, stand-alone, integration tests)
- Setup, configuration, database migration (at the kernel level) of network equipment

TIER III NCOC N.V. DATA PROCESSING CENTER MAINTENANCE



Scope of work:
Comprehensive maintenance and repair of engineering systems of the NCOC N.V Data Processing Center in Atyrau city certified according to TIER III standard. (Transformer substation 2x2.5 MW, DGU 2x2.5 MW, UPS 1.2+0.4+0.4 MW, precision air conditioning and ventilation systems, monitoring system, fire protection systems, access control system, video surveillance).

CONSTRUCTION OF SEVER (NORTH) TEMPORARY ROTATIONAL CAMP IN TENGIZ ROTATIONAL CAMP

Customer:
  • Velesstroy LLC, Russian Federation, Moscow city.
Scope of work:
A complex of construction and installation works for the arrangement of a temporary rotational camp for 250 places in Tengiz rotational shift camp.


DESIGN, SUPPLY, CONSTRUCTION, COMMISSIONING AND CERTIFICATION IN ACCORDANCE WITH TIER III


Customer:
  • NorthCaspianOperating Company NV, Netherlands, Amsterdam.
Scope of work:
Design, supply, supply of equipment and materials, construction, commissioning and certification of TIER III NCOC NV Data Processing Center in Atyrau city.


INSTALLATION OF INSTALLATION FACILITIES OF THE GAS TREATMENT COMPLEX OF CHINAREVSKOYE FIELD ZHAIK-MUNAY LLP

Customer:
  • ZhaikMunai LLP, Republic of Kazakhstan, Uralsk city.
Scope of work:
A complex of construction and installation works for the construction of technological buildings and structures of Chinarevskoye field.


MODERNIZATION OF TELEPHONE EQUIPMENT AT CPC OIL PIPELINE FACILITIES IN THE REPUBLIC OF KAZAKHSTAN



Customer:
  • Unifay LLC, Russian Federation, Moscow city.
Scope of work:
Dismantling, installation and switching of telephony equipment at Tengiz PS, Atyrau PS, ANPS-3A, ANPS-4.


ELECTRICAL INSTALLATION WORKS AT TENGIZ PS UNDER THE CPC OIL PIPELINE EXPANSION PROJECT


Customer:
  • Velesstroy LLC, Russian Federation, Moscow city.
Scope of work:
A complex of construction and installation works for the arrangement of a temporary rotational camp for 250 places in Tengiz s rotational camp.

DESIGN, SUPPLY AND INSTALLATION OF UNINTERRUPTIBLE POWER SOURCES OF OIL PIPELINE COMMUNICATION SYSTEMS 17 CPC

Customer:
  • TelventEnergia SA, Madrid, Spain.
Scope of work:
Design, supply, installation and commissioning of Benning uninterruptible power supplies for communication systems at 17 CPC oil pipeline facilities in the Republic of Kazakhstan and the Russian Federation (Tengiz PS, Atyrau PS, A-PS-4, A-PS-3A, A-PS-4A, Astarakhanskaya PS, PS-5A, Komsomolskaya PS, PS-2, PS-3, PS-4, PS-5, Kropotkinskaya PS PS-7, PS-8, Reservoir Park, Shore Facilities).


ELECTRICAL INSTALLATION WORKS ON THE TERRITORY OF THE ATYRAU OIL REFINERY (AOR)


Customer:
  • NGSK Kazstroyservice JSC, Republic of Kazakhstan, Almaty city.
Scope of work:
Electrical installation work on the territory of Atyrau Oil Refinery.


DELIVERY, INSTALLATION AND COMMISSIONING OF ISI GIPS INDER ACCESS CONTROL SYSTEM


Customer:
  • ISI Gipsinder LLP, Republic of Kazakhstan, Inderborskiy village.
Scope of work:
Supply of materials and equipment, installation and commissioning of the access control system.




DESIGN OF TAX DECLARATION PROCESSING CENTERS OF THE TAX COMMITTEE OF THE MINISTRY OF JUSTICE OF THE REPUBLIC OF KAZAKHSTAN

Customer:
  • MKM-Service LLP, Republic of Kazakhstan, Almaty city.
Scope of work:
Design of information systems, security systems (security alarm, fire alarm, fire-fighting system), communication and monitoring of five buildings of the designed declaration processing centers (Central - Astana and regional ones in the cities of Almaty, Karaganda, Aktobe, Kostanay).

CONSTRUCTION OF A FIBER-OPTIC COMMUNICATION LINE (FOCL) OF THE OIL PIPELINE OF CASPIAN PIPELINE CONSORTIUM (CPC) IN THE SECTION OF 116-204 KM

Customer:
  • Caspian Pipeline Consortium CJSC, Russian Federation, Moscow city.
Scope of work:
Construction, installation and commissioning of FOCL of CPC oil pipeline in the section of 116-224 km including the crossing of the Ural River by horizontal directional drilling.




ELECTRIC LABORATORY SERVICES ON CPC PIPELINE EXPANSION PROJECT, SECTION 116-204 KM


Customer:
  • NHSK Kazstroyservice JSC, Republic of Kazakhstan, Atyrau city.
Scope of work:
Services of electrotechnical laboratory for testing power cables before and after laying, testing transformer substations at the crane units of CPC oil pipeline (section 116-204 km.


DESIGN AND INSTALLATION OF COMMERCIAL OIL METERING UNIT AT KULZHANSKOYE FIELD

Customer:
  • MEERBUSCH LLP, Republic of Kazakhstan, Aktau city.
Scope of work:
Detailed design, manufacture, supply, installation and commissioning of commercial oil metering unit at Kulzhanskoye field.




INSTALLATION OF METAL STRUCTURES ON THE TERRITORY OF THE ATYRAU OIL REFINERY (AOR)

Customer:
  • Eurasian Construction Capital LLP, Republic of Kazakhstan, Atyrau city.
Scope of work:
Installation of metal structures on the territory of Atyrau Oil Refinery.

ELECTRICAL INSTALLATION WORKS AT THE COMPLEX TREATMENT UNIT OF OIL, GAS AND SULFUR OF AGIP KKO KARABATAN PLANT

Customer:
MSS-TEK LLP, Republic of Kazakhstan, Atyrau city.

Scope of work:
Installation of the “Fire and Gas” system at Zone 220, Pump Stations No. 3, No. 2, Rack 52A, 52B, complex treatment unit of oil, gas and sulfur of Agip KKO Karabatan plant.

INSTALLATION OF THE POWER SUPPLY NETWORK AND STRUCTURED CABLE SYSTEMS IN OFFICE PREMISES OF ROSETTI KAZAKHSTAN LLP

Customer:
Rosetti Kazakhstan LLP., Atyrau Branch, РК, г. Атырау.

Scope of work:
Installation of the power supply network and structured cable systems in office premises of Rosetti Kazakhstan LLP in Atyrau city.



INSTALLATION AND COMMISSIONING OF CMD&A EQUIPMENT UNDER THE PROJECT OF EXPANSION OF CPC OIL PIPELINE 0-116 KM

Customer:
StroyTransGaz OJSC, Republic of Kazakhstan, Almaty city.

Scope of work:
Installation and commissioning of CMD&A equipment at the sites of six crane units of CPC oil pipeline in the section of 0-116 km.

INSTALLATION OF SCS IN OFFICE PREMISES OF ERSAI CASPIAN CONTRACTOR

Customer:
Ersai Caspian Contractor, Republic of Kazakhstan, Aktau city.

Scope of work:
Supply of equipment and installation of structured cabling systems in the office premises of ErsaiCaspianContractor in
Atyrau city.
Multidisciplinary Engineering Company
Contacts
  • info@compasservice.kz
  • +7 771 311 1782
  • Oteshkali Atambayev Street, 13А, Atyrau, Kazakhstan
Compass Service
Contacts
  • info@compasservice.kz
  • +7 771 311 1782
  • Oteshkali Atambayev Street, 13А, Atyrau, Kazakhstan